The river restoration project will form the centrepiece of a new green-blue network aimed at improving air quality, reducing urban heat, and creating healthier open spaces for residents in one of the city’s most densely populated areas.
As part of the master plan, the rejuvenated riverfront will feature landscaped parks, tree-lined walkways, and interconnected public spaces designed to enhance both the environment and the quality of urban life.
Officials said around 40,000 trees will be planted and restored in phases across Dharavi. In addition, nearly 2 lakh compensatory trees will be planted across the Mumbai Metropolitan Region (MMR) to support the project’s environmental goals.
One of the project’s key attractions will be a 3.3-km public promenade along the restored Mithi River. The riverside walkway will stretch from the Matunga culvert to the river’s mouth and will be open to all Mumbai residents.
The promenade will include viewing decks, cafes, and spaces for cultural activities while preserving the river’s natural ecosystem.
Project officials said native tree species and pollution-absorbing plants will be planted along the riverbank. The plan also includes permeable pavements and bioswales to improve rainwater management, increase groundwater recharge, and support the long-term health of the river ecosystem.
The riverfront will be connected to other green spaces through a 15-metre-wide green spine for pedestrians and cyclists, along with a large central park and several neighbourhood parks planned across Dharavi.
According to officials, these interconnected green spaces are expected to improve air circulation, reduce the urban heat island effect, and provide cleaner, healthier, and more accessible public areas for residents.
Authorities informed the Tree Authority that the planned plantation of 40,000 trees is nearly five times the number of trees proposed to be removed for the redevelopment project.
Since sufficient land is not available within the BMC limits, compensatory plantation is being carried out in Palghar district. Officials said around 30,000 trees have already been planted at Chahade village, while the target for the current monsoon season is approximately 75,000 trees.
Environmental consultancy Terracon has been appointed to oversee the plantation programme, including scientific planting methods, irrigation, protection, and maintenance. The agency will also submit mandatory survival reports every six months to monitor the health of the trees.
Officials said Adani Navbharat Developers Private Limited (ANDPL) will bear the entire cost of tree plantation and maintenance for five years. According to the company, the combined efforts to restore the Mithi River, expand green cover, and develop interconnected parks will help improve the local environment and make green public spaces a key part of Dharavi’s transformation.
read more at mumbaipune.co.in