Mumbai Metro 3 Aqua Line: Route, Stations, Timings, Fares and Updates 2025

Kunal Singh
11 Min Read
5/5 - (1 vote)

Mumbai Metro 3 Aqua Line: Complete Guide

The Mumbai Metro 3 Aqua Line is one of the biggest infrastructure projects in Mumbai’s history. It is the city’s first fully underground metro line, stretching 33.5 km from Aarey Colony in the north to Cuffe Parade in South Mumbai. With 27 stations, this metro line will directly connect many important residential, business, and transit hubs.

Once fully opened, the Aqua Line will save lakhs of people from long road traffic and reduce travel time by more than half. For example, the current road journey from Aarey to Cuffe Parade takes about 90–100 minutes during peak traffic, but the same trip on the Aqua Line will take just around 54 minutes.

This project is handled by the Mumbai Metro Rail Corporation Limited (MMRCL), a joint venture between the Government of India and Government of Maharashtra. The Japan International Cooperation Agency (JICA) has provided major funding, which is why the Aqua Line also features some of the latest engineering and eco-friendly systems.

The metro is expected to carry over 1.3 million passengers every day once fully operational. It will also connect with airports, other metro lines, and suburban railway stations, making it a game-changer for Mumbai’s transport system.


History and Planning of Mumbai Metro 3 Aqua Line

The idea of the Aqua Line started way back in 2004. At that time, it was planned as a 20 km route from Colaba to Bandra. Later in 2011, the plan was extended further north to SEEPZ (Santacruz Electronics Export Processing Zone), making it a 33.5 km line.

To avoid disturbing busy and crowded areas, the entire line was designed as an underground corridor. The Mumbai Metro Rail Corporation (MMRCL) was created in 2008 to oversee the project. After receiving full approval from the Central Government in 2013, the foundation stone was laid in 2014.

But actual construction started only in 2016, after solving tender disputes and environmental issues. The project faced many delays due to land acquisition, protests about the Aarey car shed, and even a pause during the COVID-19 pandemic.

The estimated cost also went up from ₹23,136 crore to ₹37,276 crore because of delays and changes. Still, despite challenges, the Aqua Line has reached its final stage and is ready to serve the city.


Route and Stations of Aqua Line

The Aqua Line runs north to south, connecting Mumbai’s key business and residential areas. Starting from Aarey Depot, it goes through the airport, Bandra Kurla Complex (BKC), Dadar, Worli, and ends at Cuffe Parade. Out of 27 stations, 26 are underground and only one (Aarey Depot) is at ground level.

Here’s a full list of Aqua Line stations with opening phases and interchanges:

StationTypeOpening DateInterchange Options
Aarey JVLRAt-gradeOct 7, 2024Pink Line (under construction)
SEEPZUndergroundOct 7, 2024
MIDC AndheriUndergroundOct 7, 2024
Marol NakaUndergroundOct 7, 2024Blue Line
CSMIA T2UndergroundOct 7, 2024Red Line (under construction), Gold Line (proposed)
Sahar RoadUndergroundOct 7, 2024
CSMIA T1UndergroundOct 7, 2024
SantacruzUndergroundOct 7, 2024Suburban Rail (Western & Harbour)
Bandra ColonyUndergroundOct 7, 2024
Bandra Kurla ComplexUndergroundOct 7, 2024Yellow Line (under construction)
DharaviUndergroundMay 9, 2025
Shitaladevi MandirUndergroundMay 9, 2025
DadarUndergroundMay 9, 2025Suburban Rail (Western & Central)
SiddhivinayakUndergroundMay 9, 2025
WorliUndergroundMay 9, 2025
Acharya Atre ChowkUndergroundMay 9, 2025
Science MuseumUndergroundSept 30, 2025
MahalaxmiUndergroundSept 30, 2025Suburban Rail + Monorail
Jagannath Shankar Sheth MetroUndergroundSept 30, 2025Suburban Rail (Western Line)
Grant RoadUndergroundSept 30, 2025Suburban Rail (Western Line)
GirgaonUndergroundSept 30, 2025
KalbadeviUndergroundSept 30, 2025
CSMTUndergroundSept 30, 2025Suburban Rail (Central & Harbour), Green Line (proposed)
Hutatma ChowkUndergroundSept 30, 2025
ChurchgateUndergroundSept 30, 2025Suburban Rail (Western Line)
Vidhan BhavanUndergroundSept 30, 2025
Cuffe ParadeUndergroundSept 30, 2025

The route ensures smooth connectivity with airports, major business hubs, and heritage areas in South Mumbai.


Construction and Challenges

Construction of the Aqua Line began in 2017, with tunneling starting the same year. Special Tunnel Boring Machines (TBMs) were used to dig underground routes safely. Some parts of South Mumbai required controlled micro-blasting because of old heritage buildings and narrow roads.

One of the toughest engineering feats was the 170-meter twin tunnel under the Mithi River, completed in 2020. This was India’s second-ever under-river metro tunnel after Kolkata.

The project faced many challenges:

  • Protests about cutting trees in Aarey Colony for the car shed.
  • Traffic disruptions on busy city roads during digging.
  • Cost increase due to delays and pandemic.
  • Legal battles that went up to the Supreme Court.

Despite all this, trial runs began in 2022, and by 2025, over 96% of work was completed.


Trains and Technology

The Aqua Line will run driverless, air-conditioned trains built by Alstom under the “Make in India” initiative. These modern trains come with:

  • Wide automatic doors.
  • CCTV cameras for safety.
  • Women-only coaches.
  • Capacity to carry up to 3,000 passengers per train.
  • Regenerative braking system to save energy.

The system uses Communication-Based Train Control (CBTC) technology, which means trains can run with just 90–120 seconds gap during peak hours.

Stations have:

  • Platform screen doors for safety.
  • Escalators and lifts.
  • Tactile flooring for the visually impaired.
  • Facilities for cashless ticketing with cards and apps.

Operations, Timings, and Fares

The Aqua Line is opening in three phases:

  1. Phase 1 (Aarey to BKC) – Opened on Oct 7, 2024.
  2. Phase 2A (BKC to Acharya Atre Chowk) – Opened on May 9, 2025.
  3. Final Phase (Worli to Cuffe Parade) – Scheduled for Sept 30, 2025.

Timings

  • First train: 5:55 AM.
  • Last train: 10:30 PM.
  • On Sundays: service starts from 6:30 AM.
  • During festivals like Ganeshotsav, services were extended till midnight.

Fares

Fares are distance-based:

DistanceFare
0–3 km₹10
3–6 km₹20
6–12 km₹30
12–18 km₹40
18–24 km₹50
24–30 km₹60
30–36 km₹70

Example: Aarey to Cuffe Parade costs ₹60–70, which is much cheaper than a taxi ride of over ₹700 for the same distance.


Ridership and Impact

When Phase 1 opened in October 2024, only about 20,000 people used it daily. But after Phase 2 opened in May 2025, ridership went up to 37,000 per day. By August 2025, the Aqua Line had already crossed 1 crore total riders.

Once the entire line opens, it is expected to serve 1.3 million passengers daily. By 2055, this number could go up to 3.15 million passengers per day.

The Aqua Line is also boosting real estate prices. Property rates in Andheri, Santacruz, and BKC have already gone up because people prefer living near metro stations. For example, property rates in Santacruz average around ₹43,898 per sq ft.

Environmental impact is also important. By reducing private car use, the Aqua Line is expected to cut pollution and fuel use in Mumbai.


Future Plans

The next plan is to extend the Aqua Line up to Navy Nagar in South Mumbai. This will add another 2.5 km and improve connectivity even further.

Also, the Aqua Line will soon connect with other metro corridors like the Pink, Red, and Yellow Lines, making a full metro network across the city.


FAQs about Mumbai Metro 3 Aqua Line

1. What is Mumbai Metro 3 Aqua Line?

It is a fully underground metro line from Aarey to Cuffe Parade covering 33.5 km with 27 stations.

2. When will the Aqua Line be fully operational?

The final phase is scheduled to open on September 30, 2025.

3. What is the fare structure of Aqua Line?

Fares range from ₹10 to ₹70, depending on the distance traveled.

4. Which areas does the Aqua Line cover?

It connects Aarey, SEEPZ, Andheri, Airport, BKC, Dadar, Worli, Mahalaxmi, CSMT, Churchgate, and Cuffe Parade.

5. Will the Aqua Line save travel time?

Yes. Trips that take 90–100 minutes by road can be completed in about 54 minutes by metro.

Mumbai Metro 3 Aqua Line Route, Stations, Timings, Fares and Updates 2025

The Mumbai Metro 3 Aqua Line is more than just a transport project. It is a lifeline for Mumbai’s 20 million residents. With its modern trains, underground design, and wide network, it will change the way people travel in the city.

By connecting homes, offices, airports, and railway stations, the Aqua Line will save time, reduce pollution, and make travel more reliable. As it becomes fully operational in 2025, it will not only ease Mumbai’s traffic but also shape the city’s future growth.

Read More at mumbaipune.co.in

Share This Article
Follow:
Hi, I’m Kunal Singh. I write about Mumbai and Pune, exploring everything from city life and culture to the best places to visit and things to do. My aim is to share insights that make these cities even more exciting for residents and visitors alike. Keep reading for more updates and tips!
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *